Building and Construction Authority
Additional Buyer Stamp Duty (ABSD) Extension for projects that aim to achieve higher productivity targets
Gives eligible licensed housing developers a six-month extension to ABSD remission timelines when approved productivity improvements are demonstrated.
Facts last checked on , confirm on the agency site before applying.
Recorded status: Accepting applications now
Who qualifies
- Must be registered in Singapore.
- Applies to licensed Housing Developers with residential land bought on or after 6 March 2025.
- The PSIP must demonstrate at least 40% productivity improvement against the 2010 base figure for private residential typology.
- The PSIP must include standardisation, robotics and automation with minimum 50% trade coverage, and adoption of at least seven Collaborative Contracting Principles.
What it funds
- Automation, robotics, equipment upgrades for productivity
- R&D, product development, prototyping, IP
Costs covered: Hardware, machinery, IT equipment; Third-party consultant or professional service fees; Explain in notes.
Payment: Delivered as a tax deduction, allowance or credit.
How to apply
Submit the Project Specific Implementation Plan (PSIP) to BCA by email at ABSD_BE_ITM@bca.gov.sg, beginning no later than three months after URA clearance of Design Gateway and before Piling/Construction Gateway where applicable.
- Prepare the Project Specific Implementation Plan.
- Submit the first PSIP to BCA within the stated CORENET X timing.
- Respond to feedback through up to three PSIP submissions, with the final submission at Construction Gateway.
- BCA assesses the final PSIP; IRAS separately notifies the applicant of the ABSD remission extension outcome.
Documents
- Project Specific Implementation Plan (PSIP) — The page links the official template. Agency document ↗
- Site layout plans and other drawings — Official document name; format is not stated.
- Breakdown of productivity contribution of proposed initiatives — Official document name; format is not stated.
Processing time: BCA will inform applicants of the outcome upon clearance of Construction Gateway.
Claiming support
Submit half-yearly progress reports during construction and a final report after completion of construction.
During the construction stage and after completion of construction.
Contact: ABSD_BE_ITM@bca.gov.sg
Application window: The page states no application opening or closing date; the 6 March 2025 date is a land-purchase eligibility condition, and PSIP timing is tied to each project's CORENET X gateways.